Jurisdiction and research scope
City of DuPont, Pierce County, Washington, ordinary unoccupied noncommercial vehicle parking on public streets or alleys. Transit, school buses, official city vehicles, city-vendor service vehicles, emergencies, special signed segments and private property are excluded.
Research by Can I Park My RV?Official municipal sources; access limits shown belowEditorial standard
DuPont RV parking at a glance
| Location or use | What to check |
|---|---|
| Storage | Private storage not determined. |
| Public parking | Over 6.5 ft wide, 7.5 ft high or 20 ft long needs the service-and-permit exception; trailers remain limited to 4 hours. |
| Loading | Issued oversized permit plus actual adjacent service; maximum 72 hours, subject to independent limits. |
| Occupancy | Not approved. |
Three independent size triggers
Section 16.03.030(a) prohibits a vehicle on a public street or alley if it exceeds ANY of these dimensions: width 6 feet 6 inches, height 7 feet 6 inches, or length 20 feet. Equality alone does not exceed a dimension. Under subsection (b), a qualifying vehicle must actually be used for construction, delivery, loading, unloading or other service to the adjacent premises AND hold the temporary permit issued by the Public Services Director or designee.
DuPont Chapter 16.03 DuPont new laws September 2026 data-center moratorium Official city and county identity
A permit does not erase the trailer limit
Temporary oversized-vehicle permits are discretionary and allow at most 72 continuous hours. The Director may deny an application for any reason, including four or more previous permits in twelve months; four is not an automatic entitlement or a universally fixed maximum. Section 16.03.030(c) independently prohibits a trailer or any nonmotorized vehicle for more than four consecutive hours on streets, alleys or other rights-of-way. The subsection (b) exception expressly addresses subsection (a), so this checker does not use a 72-hour permit to override the four-hour rule.
DuPont Chapter 16.03 DuPont new laws September 2026 data-center moratorium Official city and county identity
Thirty days, signs and safe placement
Section 16.03.040, adopted April 28, 2026, prohibits any vehicle remaining on a street or public right-of-way beyond thirty days regardless of other rules. Minimal movement intended to avoid enforcement does not reset the stay; this guide does not promise that moving a specified distance resets it. Sections 16.03.010 and .020 separately address sidewalks, no-parking controls and specially regulated street segments. Confirm the full applicable stay, unobstructed placement and every posted restriction. These are parking provisions, not camping or hookup permission.
DuPont Chapter 16.03 DuPont new laws September 2026 data-center moratorium Official city and county identity
Who to contact for your setup
Confirm the proposal with the municipality. Limited administrative screening only, not a permit or complete legal approval. Current code includes Ordinance 26-1169 of April 28, 2026. The later September 2026 data-center moratorium was read and does not change this ordinary street-parking scope. Do not infer a reset from a thirty-foot move, an automatic four-permit entitlement, or a trailer exemption. No private storage, special signed-block, commercial, emergency, camping or hookup approval.
Use the DuPont parking checker to organize the starting conditions. The checker cannot approve a parcel, a variance or an unverified exception.
Official sources reviewed November 7, 2026
- DuPont Chapter 16.03
Official/adopted source reviewed 2026-11-07. See the amendment reconciliation and limits below.
- DuPont new laws
Official/adopted source reviewed 2026-11-07. See the amendment reconciliation and limits below.
- September 2026 data-center moratorium
Official/adopted source reviewed 2026-11-07. See the amendment reconciliation and limits below.
- Official city and county identity
Official/adopted source reviewed 2026-11-07. See the amendment reconciliation and limits below.