Knox County, Tennessee · reviewed

RV parking rules in Knox County

Unincorporated Knox County allows one qualifying RV behind the front building line, while occupied construction-site use requires a separate temporary-permit route.

Check unoccupied storageCheck loading or unloadingCheck guest sleeping

Unincorporated Knox County only; Knoxville and Farragut are separate jurisdictions. Reviewed November 6, 2026. Zoning ordinance as amended April 21, 2025, county-hosted edition; ordinary storage §3.52 and temporary occupancy §3.100.

Research by Can I Park My RV?Official municipal sources; access limits shown belowEditorial standard

Knox County RV parking at a glance

Location and use matter. Confirm the property's jurisdiction and every applicable condition.
Location or useWhat to check
Driveway

Ordinary storage behind front building line.

Yard

One covered unit/household; max 40 feet long and 10 feet wide; dwelling required.

Street

No public-street permission established.

Loading

No independent front-yard loading grace period established.

Guest

Ordinary stored RV cannot be occupied; qualifying construction permit is separate.

Hookups

Construction route requires approved services; storage does not authorize hookups.

Need RV storage near Knox County?Explore nearby storage facilities.Open Google MapsOpens in a new tab

Ordinary residential storage

On residentially zoned land with a dwelling, one camping, travel, recreational, hauling or boat trailer per household may be stored behind the front building line, no more than 40 feet long and 10 feet wide. It may not be occupied under this ordinary storage route; a vacant lot is not an accessory-storage site.

Construction-site occupancy

Section 3.100 provides a temporary-permit route on at least one acre in a residential area outside a platted subdivision during single-family construction. Occupants must be the owner or household, with no renting, adequate cooking/sleeping/sanitation and approved water, electric and sewage arrangements.

Permit timing

The initial permit can run one year but expires after six months if work has not commenced and been verified. After year one, six-month extensions require timely applications. Occupancy and utility/sewage connections must end as a condition of the new home’s certificate of occupancy. Another temporary permit requires its exact approved terms.

Who to contact for your setup

Confirm your address, zoning district and exact parking or occupancy plan with Knox County planning or code enforcement through the official source. For public streets, also ask the agency responsible for that road.

Use the Knox County parking checker to organize the starting conditions. The checker cannot approve a parcel, a variance or an unverified exception.

Official sources reviewed November 6, 2026

A review date records when we checked these sources. The notes above explain any use of older code editions or limits on access to the full source; an address-specific local-government determination may still be required. Read our research method.