Jurisdiction and research scope
Unincorporated Spokane County, Washington only, not the City of Spokane, Spokane Valley, Liberty Lake, Cheney, Airway Heights or other incorporated municipalities. Official county Zoning Code, 2025 Printing, includes Resolution 24-0698 adopted November 12, 2024. Read November 6, 2026. Later amendments, parcel approvals and building/health requirements must be confirmed.
Research by Can I Park My RV?Official municipal sources; access limits shown belowEditorial standard
Spokane County RV parking at a glance
| Location or use | What to check |
|---|---|
| Driveway / yard | Confirm parcel zoning and any issued temporary-use decision before RV occupancy. The 30-day RV definition is not an automatic private-lot camping allowance. |
| Street / loading | County zoning definitions do not establish public-road parking permission. No standalone extended loading exemption is established here. |
| Sleeping / utilities | Temporary-use permit may run up to six months; written, approved extensions require demonstrated cause. Building and health approvals remain separate; park health rules are not private-lot hookup approval. |
Thirty days is part of a definition
Chapter 14.300 defines an RV as a portable, non-foundation structure for recreational, camping or travel use, occupied in one place no more than 30 days. That definition does not itself allow camping on any vacant lot or residential driveway. Identify the parcel’s use table and any permit before occupying the vehicle.
Temporary-use decisions are site-specific
Under 14.506.200(1), a property owner may apply to use a structure or premises temporarily for a purpose not otherwise conforming to the zone, without erecting a substantial structure. The county may grant a temporary, revocable permit up to six months with protective conditions. The planning director may grant annual 12-month extensions for demonstrated cause upon written request. Neither a request nor the possibility of extension is an approval.
Parks, utilities and storage remain separate
Approved RV parks follow their district and hearing-examiner conditions and Regional Health sewage/water rules. A park approval does not transfer to a backyard. The dependent-relative manufactured-home route is a different vehicle/use classification. Unoccupied storage, loading, repairs and street parking also need their applicable rules, not the RV definition or a general temporary-use application.
Who to contact for your setup
Ask Spokane County Planning or Code Enforcement to confirm jurisdiction, the actual parcel or road, vehicle classification, position, duration and intended use. Obtain the required road, building, electrical, plumbing or wastewater approvals before relying on a parking exception. Easements, HOA rules and leases remain separate. Start with the official rule or permit guidance.
Use the Spokane County parking checker to organize the starting conditions. The checker cannot approve a parcel, a variance or an unverified exception.
Official sources reviewed November 6, 2026
- Spokane County Zoning Code, 2025 Printing
14.300 RV definition; 14.506.200 temporary use and extensions; separate commercial and rural RV park conditions.
A review date records when we checked these sources. The notes above explain any use of older code editions or limits on access to the full source; an address-specific local-government determination may still be required. Read our research method.
Was this guide helpful?
Anonymous feedback · How we use it