Grand County, Utah · reviewed

RV parking rules in Grand County

Grand County’s Alternative Dwelling Overlay is closed to new applications; existing approved developments retain workforce-housing standards and 60-day minimum rentals.

Check unoccupied storageCheck loading / unloadingCheck sleeping in an RV

Unincorporated Grand County, Utah only; not any incorporated city or town, tribal land, or a state/federal campground with its own rules. Current eCode360 Land Use Code §§4.9.1–4.9.8, Ordinance 668 Exhibit A (2022), read November 6, 2026. The code expressly records the November 15, 2023 pilot sunset and continued standards for approved projects.

Research by Can I Park My RV?Official municipal sources; access limits shown belowEditorial standard

Grand County RV parking at a glance

Location and use matter. Confirm the property's jurisdiction and every applicable condition.
Location or useWhat to check
Driveway / yardOrdinary private-lot storage is separate from an approved ADO housing development. Approved ADO sites need improved surfaces, approved layout and applicable setbacks.
Street / loadingPrivate-land rules do not authorize public-street parking or camping; confirm the road authority and posted restrictions. No separate RV loading allowance is established by the cited private-land provisions.
Sleeping / utilitiesADO tourist overnight stays prohibited; approved-project rentals at least 60 consecutive days. ADO requires public water/sewer and approved site hookups or specified shared facilities.
Need RV storage near Grand County?Explore nearby storage facilities.Open Google MapsOpens in a new tab

The overlay pilot is no longer open

The Alternative Dwelling Overlay pilot expired on November 15, 2023 or approval of 150 units, whichever occurred first. The current code says the county will not accept new overlay-rezone applications. Standards remain applicable to projects already approved for the district. This is not an open route to place a new residential RV on an ordinary private parcel.

Approved sites are for longer-term housing

Existing ADO developments serve local residents and workforce, not tourist overnight accommodations. Rentals must be for at least 60 consecutive days by tenants or their employers. The approved development agreement, deed restriction, master plan and underlying zoning continue to govern. Confirm the exact site is in an approved, implemented project; an old application or the presence of other RVs is not enough.

Placement and services still matter

ADO developments require public water and sewer. Each dwelling site supplies water, sewer and electric hookups unless approved shared facilities satisfy the code: required bathhouses, a covered wash/sink area and potable water within 200 feet. RV sites need improved surfaces; each dwelling site needs an off-street vehicle space, and emergency access and setbacks apply. These project standards do not determine ordinary home storage, loading or street camping. Obtain a separate county answer for those uses.

Who to contact for your setup

Ask Grand County Planning or Code Enforcement to confirm jurisdiction, the actual parcel or road, vehicle classification, position, duration and intended use. Obtain the required road, building, electrical, plumbing or wastewater approvals before relying on a parking exception. Easements, HOA rules and leases remain separate. Start with the official rule or permit guidance.

Use the Grand County parking checker to organize the starting conditions. The checker cannot approve a parcel, a variance or an unverified exception.

Official sources reviewed November 6, 2026

A review date records when we checked these sources. The notes above explain any use of older code editions or limits on access to the full source; an address-specific local-government determination may still be required. Read our research method.